top of page
FV_CountyOffice_MainOffice.JPG

County News & Notices

Call white_2x.png
Abstract White Pattern
Mail White_2x.png
Abstract White Pattern
Location White_2x.png
Abstract White Pattern

Tompkins Crossing Ice Bridge Open for Season - 5 Tonne Capacity

  • Dec 12, 2025
  • 1 min read

December 12, 2025


The Tompkins Crossing Ice Bridge is now OPEN for the season with a maximum capacity of 5 tonne effective Friday, December 12, 2025 at 2 PM. Crossing the ice bridge is open for light traffic only. Please use caution when crossing the Ice Bridge and travel at the posted speed limit. Do not cross the Ice Bridge with a load that is over the capacity posted.

Crossing the ice bridge with a load that is over the limit jeopardizes the safety of yourself and others and could lead to the ice bridge closure due to damage repairs.

Ice Bridge Status Updates can be found on:

  • Signs along the highways leading to the Crossing

  • Mackenzie County Facebook, Instagram and X.com

  • Visit 511.alberta.ca, follow on Social Media @511Alberta or dial the toll free number 511


bottom of page