top of page
FV_CountyOffice_MainOffice.JPG

County News & Notices

ZamaCity_Buffalo.jpg

One Special Adventure Pack

One very special 2026 Adventure Pack includes a Minister’s Special Licence for a Hay-Zama wood bison hunt. 

The Minister’s Special Licence is not separately available for purchase. It is included only in one 2026 Adventure Pack and is subject to all applicable restrictions, terms, conditions, Minister’s requirements, and Alberta hunting rules.

Tompkins Crossing Ice Bridge - 40 Tonnes Capacity

Jan 30, 2025
1 min read

Updated: Apr 22

January 30, 2025 



The Tompkins Crossing Ice Bridge capacity has increased to a maximum of 40 tonnes, effective Thursday, January 30, 2025 at 2:00 p.m. The Ice Bridge first opened on December 19, 2024 for light weight traffic at a maximum capacity of 5 tonnes for the 2024/2025 winter season. Please use caution when crossing the Ice Bridge and travel at the posted speed limit. Do not cross the Ice Bridge with a load that is over the capacity posted.


bottom of page