top of page
FV_CountyOffice_MainOffice.JPG

County News & Notices

Call white_2x.png
Abstract White Pattern
Mail White_2x.png
Abstract White Pattern
Location White_2x.png
Abstract White Pattern

Tompkins Crossing Ice Bridge - 35 Tonnes Capacity

  • Jan 20, 2025
  • 1 min read

Updated: Apr 22

January 20, 2025 


The Tompkins Crossing Ice Bridge capacity has increased to a maximum of 35 tonnes, effective Monday, January 20, 2025 at 2:00 p.m. The Ice Bridge first opened on December 19, 2024 for light weight traffic at a maximum capacity of 5 tonnes for the 2024/2025 winter season. Please use caution when crossing the Ice Bridge and travel at the posted speed limit. Do not cross the Ice Bridge with a load that is over the capacity posted.


bottom of page