Tompkins Crossing Ice Bridge - 55 Tonne Capacity
- Jan 23
- 1 min read
Updated: Jul 27

News | January 23, 2026
The Tompkins Crossing Ice Bridge capacity has increased to a maximum of 55 tonne, effective Friday, January 23, 2026 at 2 p.m.
The Ice Bridge first opened on December 12, 2025 for light weight traffic at a maximum capacity of 5 tonne for the 2025/2026 winter season. Please use caution when crossing the Ice Bridge and travel at the posted speed limit.
Do not cross the Ice Bridge with a load that is over the capacity posted.








